Brian Summerall has extensive experience in the oil and gas industry, specifically in cased hole engineering. Starting with Weatherford from September 2010 to July 2016, Brian Summerall developed a solid foundation in the field. Subsequently, Brian Summerall continued in a similar role at Patriot Well Solutions from July 2016 to August 2017. Currently, Brian Summerall serves as a Cased Hole Engineer at MBI Energy Services, a position held since August 2017.
Sign up to view 0 direct reports
Get started